The Roy Residence was done in collaboration with ASA as the need of the project was to do a quick construction which was done here with new and innovative construction materials where tubular structural steel frame were used through which the construction was able to be completed in 3 weeks yet not compromising on the durability and longevity of the residence which was the main aim of beg associates.